Qlogic QLA2100F Guia do Utilizador Página 161

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 406
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 160
Chapter 2. IBM TotalStorage Enterprise Storage Server configuration 147
If we press OK, we do not change back to the Open System Storage panel.
Instead, we see the new volume assignments to the host FC port PC1_1, as
shown in Figure 2-94.
Figure 2-94 Assignments for the host FC port PC1_1
Viewing changes on the Graphical View panel
Back on the Storage Allocation Graphical View panel, we now see that the
host FC port PC1_1 has volumes assigned to it on all four disk groups as shown
in Figure 2-95.
Vista de página 160
1 2 ... 156 157 158 159 160 161 162 163 164 165 166 ... 405 406

Comentários a estes Manuais

Sem comentários